20kWp Office solar system
Project - Office Solar System
Location - Lekki, Lagos State, Nigeria
Solar/PV - 20kWp
Inverters - SRNE 24kW (8kWx 3)
Batteries - SRNE (48kWh)
Scope - Power office with a 3 phase solar system
ATO Architects engaged Crimson Power to design and install a tailored solar power solution for their headquarters in Lekki, Lagos. Given the presence of a critical three-phase load, the system was specifically designed to operate as a three-phase setup, ensuring seamless power distribution and reliability.
This fully automated system prioritizes solar energy during the day, seamlessly switching to battery-stored power at night or during low solar availability. The primary goal was to reduce reliance on diesel generators, minimizing fuel consumption while maintaining a stable and sustainable power supply for their operations.